Stockport · education

LED and emergency lighting in a summer holiday

  • £150k to £200k
  • Lighting and controls
  • 6 weeks, in the summer holiday
  • Completed August 2025

The project

A bright school corridor with new LED ceiling panels, navy lockers and green emergency exit signs above the doors.

Download this case studyPDF, one page

Client
A multi-academy trust
Main contractor
Direct for the trust
Consultant
The trust's estates team
Location
Stockport
Sector
Education
Contract value
£150k to £200k
Programme
6 weeks, in the summer holiday
Floor area
42 classrooms and 3 corridors
Form of contract
JCT Minor Works Building Contract
Our role
Principal contractor
Completed
August 2025
Occupied throughout
Empty for the holiday, shared with two other contractors
Safety
0 lost-time incidents

The result in numbers

  • 4 daysto spare before the staff training days
  • 780LED panels with presence and daylight control
  • 61%lower lighting energy
  • 100%of escape routes on self-test emergency lighting
  • 0teaching days lost

The brief

A multi-academy trust wanted a primary school's fluorescent lighting replaced and its emergency lighting brought up to standard, without losing a day of teaching.

What we worked around

  • The whole programme had to fit inside the six-week summer holiday
  • Enhanced DBS checks for every operative, and the trust's safeguarding rules
  • Site shared with the trust's decorators and a roofing contractor

Our solution

We planned the six weeks around the decorators and roofers already booked for August, ran two teams corridor by corridor, and kept every operative inside the trust's safeguarding rules with enhanced DBS checks.

Two electricians fitting LED panels into the ceiling of an empty classroom, one on a podium step and one handing up a panel, the chairs stacked on the desks.
August: new panels in an empty classroom

What we installed

  • 780 LED panels with presence and daylight control
  • New self-test emergency lighting on every escape route
  • Fixed wire testing of the circuits we touched
  • Lighting energy calculation for the trust's estates team
An electrician with a tablet turning a key switch to test the emergency lighting beside an exit sign in a school corridor.
Testing the new emergency lighting

Programme

Six weeks inside the summer holiday, with the three-hour duration test witnessed in the final week.

The result

Finished four days early, with lighting energy down 61% and every escape route on self-test emergency lighting.

Handover

Emergency lighting completion certificates, the logbook started, an energy calculation for the estates team and the O&M manual, all in the trust's portal.

A B C D E F 1 2 3 4 RISER DB-A2 DB-B2 59.0 m N CONTAINMENTDISTRIBUTION BOARDLUMINAIRE LED AND EMERGENCY LIGHTING IN A SUMMER H DRG MR-6124-E-238 ILLUSTRATIVE ONLY SCALE 1:200 REV E
Illustrative drawing generated for this record, not the client's building.

Finished with four days to spare, and the classrooms were cleaner than the decorators left them.

Estates manager, multi-academy trust