Fixed wire testing

Testing and inspection

Fixed wire testing, thermographic surveys and PAT across your estate, scheduled around how each building is used.

What's involved

An electrician in a hard hat testing a locked-off distribution board in a plant room, a multifunction tester at her side and a sheet of test results clipped to the door.
How long
Most single buildings in one to three nights
You get
EICR, remedial completion certificates and thermographic reports

Get a priceCall 0161 496 0384

How often

  • Offices, shops and schools at least every five years
  • Industrial premises at least every three years
  • Whenever your insurer, landlord or a change of use asks

What's included

  • Electrical Installation Condition Reports (EICRs) to BS 7671
  • Out-of-hours testing, with isolations agreed in advance
  • Thermographic surveys of switchgear, often an insurer's requirement
  • Remedial works priced item by item for you to approve
  • Every report and certificate in your portal, with the next date tracked

How it goes

  1. Plan

    Schedules and isolations agreed with each site manager.

  2. Test

    Circuits tested and recorded, with C1 dangers made safe straight away.

  3. Report

    Within five working days, with remedials priced line by line.

  4. Remedials

    Approved in your portal, completed, and the report reissued.

Have a project to price?

Send us a brief, invite us to tender, or download our pack for your approved list.

Start a project briefInvite us to tenderDownload our tender pack