Power where it's needed
Distribution and containment
New LV distribution, sub-mains and the containment that carries them, from switchroom to final board.
What's involved

- How long
- From a weekend shutdown to a ten-week phased install
- You get
- Electrical Installation Certificate and updated single-line diagram
When it's needed
- New plant, production lines or automation that need power
- An extension or a change of use that outgrows the existing boards
- Old distribution reported as C2 or at the end of its life
What's included
- LV switchboards, panel boards and distribution boards
- Sub-main cabling, armoured and fire-rated
- Cable ladder, tray, basket and trunking, installed to the drawings
- Coordinated shutdowns and a switching programme agreed with you
- Testing, labelling and updated schematics
How it goes
Survey
Loads, routes and the existing supply checked, with any constraints from the network operator noted.
Design
Cable sizing, discrimination and a single-line diagram you can check.
Shutdowns
Every isolation planned with your engineers and booked weeks ahead.
Commission
Tested, certified and handed over with updated schematics in the switchroom.