Power where it's needed

Distribution and containment

New LV distribution, sub-mains and the containment that carries them, from switchroom to final board.

What's involved

Two electricians in Marlow & Reed hi-vis on a scissor lift pulling cable through trays above warehouse racking, a third watching from behind barriers.
How long
From a weekend shutdown to a ten-week phased install
You get
Electrical Installation Certificate and updated single-line diagram

Get a priceCall 0161 496 0384

When it's needed

  • New plant, production lines or automation that need power
  • An extension or a change of use that outgrows the existing boards
  • Old distribution reported as C2 or at the end of its life

What's included

  • LV switchboards, panel boards and distribution boards
  • Sub-main cabling, armoured and fire-rated
  • Cable ladder, tray, basket and trunking, installed to the drawings
  • Coordinated shutdowns and a switching programme agreed with you
  • Testing, labelling and updated schematics

How it goes

  1. Survey

    Loads, routes and the existing supply checked, with any constraints from the network operator noted.

  2. Design

    Cable sizing, discrimination and a single-line diagram you can check.

  3. Shutdowns

    Every isolation planned with your engineers and booked weeks ahead.

  4. Commission

    Tested, certified and handed over with updated schematics in the switchroom.