Altrincham · retail

An overnight lighting refit, open every day

  • £50k to £100k
  • Lighting and controls
  • 4 weeks of nights
  • Completed February 2026

The project

A finished clothing shop with black track spotlights and linear lights over rails of clothes and display tables, the street visible through the open front.

Download this case studyPDF, one page

Client
A fashion retailer
Main contractor
Direct for the retailer's store development team
Consultant
The retailer's lighting designer
Location
Altrincham
Contract value
£50k to £100k
Programme
4 weeks of nights
Floor area
640 m² sales floor
Form of contract
Fixed price, the retailer's own terms
Our role
Electrical contractor
Completed
February 2026
Occupied throughout
Yes: the store traded every day
Safety
0 lost-time incidents

The result in numbers

  • 20night shifts
  • 0trading hours lost
  • 48%lower lighting energy
  • 6amthe floor handed back, every morning

The brief

A fashion retailer wanted its flagship store relit for a new season without closing it for a single day.

What we worked around

  • Work only between 9pm and 6am, with the floor handed back ready to trade
  • Stock and fittings protected, and nothing left out for customers
  • Parking and deliveries on the street restricted at night

Our solution

We worked between 9pm and 6am, protected every fitting and rail before starting, and handed the floor back to the store team clean and ready to trade each morning.

Electricians on stepladders adjusting track lights in a clothing shop at night, the rails covered in plastic and the tables under dust sheets behind a barrier, shutters down.
2am: fittings sheeted, the lighting track rewired

What we installed

  • Track lighting and linear LED across the sales floor
  • New lighting circuits and controls in the back of house
  • Emergency lighting brought into line with the new layout

Programme

Four weeks of nights, finished before the launch weekend so the visual merchandisers could dress to the new lighting.

The result

The store opened on time every morning, and lighting energy fell by 48%.

Handover

A lighting layout as fitted, test certificates and the emergency lighting logbook brought up to date with the new layout.

A B C D E F 1 2 3 4 RISER DB-A1 DB-B1 52.0 m N CONTAINMENTDISTRIBUTION BOARDLUMINAIRE AN OVERNIGHT LIGHTING REFIT, OPEN EVERY DRG MR-9218-E-218 ILLUSTRATIVE ONLY SCALE 1:200 REV G
Illustrative drawing generated for this record, not the client's building.

We opened on time every single morning. Nobody on the floor knew we'd been there.

Store operations manager, fashion retailer