Wythenshawe, Manchester · healthcare

Fire alarm and lighting in a health centre that never shut

  • £150k to £250k
  • Fire detection and alarm
  • 10 weeks of evenings and weekends
  • Completed June 2025

The project

Download this case studyPDF, one page

Client
A primary care landlord, for a health centre with three GP practices
Main contractor
Direct for the landlord
Consultant
The landlord's fire engineer
Location
Wythenshawe
Contract value
£150k to £250k
Programme
10 weeks of evenings and weekends
Floor area
1,900 m² over two floors
Form of contract
JCT Minor Works Building Contract
Our role
Principal contractor
Completed
June 2025
Occupied throughout
Yes: three GP practices held clinics every weekday
Safety
0 lost-time incidents

The result in numbers

  • 0clinic sessions cancelled
  • 212addressable fire alarm devices
  • 0hours without fire alarm cover
  • 100%of escape routes on self-test emergency lighting
  • 0false alarms in the first six months

The brief

A primary care landlord needed the fire alarm and lighting replaced in a Wythenshawe health centre that houses three GP practices and opens every weekday.

What we worked around

  • Work only after the last clinic and at weekends, with every room clean before the morning list
  • The old fire alarm kept working until the new one was proved, zone by zone
  • Infection control rules in every clinical room, agreed with the practice managers

Our solution

We worked after the last clinic and at weekends, zone by zone. Each zone of the new addressable system was installed, tested and witnessed before the old one was disconnected, so the building was never without detection, and every room was cleaned to the practices' standard before the morning.

After the last clinic: detectors going in, corridor sheeted

What we installed

  • A new L1 addressable fire alarm across both floors
  • LED lighting in the waiting areas, corridors and consulting rooms
  • Self-test emergency lighting on every escape route
The new addressable fire alarm panel by the entrance

Programme

Ten weeks of evenings and weekends, with each zone handed over and witnessed by the landlord's fire engineer as it was finished.

The result

No clinic session was cancelled, the building was never without fire alarm cover, and the new system had no false alarms in its first six months.

Handover

Fire alarm design, installation and commissioning certificates, the zone chart, emergency lighting certificates and the logbooks, filed in the landlord's portal.

A B C D E F 1 2 3 4 RISER DB-A3 DB-B3 DB-C1 33.0 m N CONTAINMENTDISTRIBUTION BOARDLUMINAIRE FIRE ALARM AND LIGHTING IN A HEALTH CENT DRG MR-2019-E-216 ILLUSTRATIVE ONLY SCALE 1:200 REV F
Illustrative drawing generated for this record, not the client's building.

The practices only knew they'd been in because the lights were better.

Estates manager, primary care landlord