When the supply needs work
Fuse boards and supply upgrades
A small board of its own for the charger, a new consumer unit, or a bigger main fuse arranged with your network operator.
What's involved

- Price
- From £145Most jobs £145
- How long
- Usually the same day as the charger
- You get
- Electrical Installation Certificate, and building control notification
Estimate yoursCall 0113 496 0427
A bigger main fuse is your network operator's, and normally free. We fit everything on your side of the meter.
When it's needed
- Your fuse board is full, with no space for the charger's protection
- It has fuse wire, cartridge fuses or a wooden back
- Your main fuse is 60 amps and the network operator wants it bigger
- You'd like a 22 kW charger and need a three-phase supply
What's included
- A small board for the charger, or a new consumer unit with RCBO protection
- Every circuit tested, before and after
- The network operator's work arranged for you, where it's needed
- Your certificate and the building control notification
How it goes
Photos or survey
We work out what's needed, and nothing more, from your photos or a visit.
Network operator
Where the fuse or supply needs changing, we apply and arrange their visit.
The work
Usually on the same day as your charger.
Questions
Will my network operator charge for a bigger fuse?
Usually not. Upgrading a 60 amp main fuse is normally free. A three-phase supply is priced by them after their own survey.
Your fixed price, from four photos.
Answer a few questions for your price now, then send the photos to fix it in writing.